<pre style="word-wrap:break-word;" wrap="soft">Hello everyone,<br></pre>   <br>      Can high order time integration scheme (such as 3rd or higher order Runge Kutta  method ) work when WENO5 or WENO-Z is used in conjunction with with AMR grids provided by a PARAMESH 4?<br><br>  Thanks!<br> WeiGang<br><br><br><br>